Installing your storage system

Virtual Storage Platform One Block 20 Installation Guide

Version
A3-02-2x
Audience
anonymous
Part Number
MK-23VSP1B008-01

Hitachi Virtual Storage Platform One Block 20 (VSP One Block 20) storage systems are designed for self-installation, so you can install and set up your storage system for the first time without assistance from a Hitachi Vantara representative.

Site preparation
Before you install the storage system, make sure your data center meets all site preparation requirements as specified in the VSP One Block Hardware Guide.
Rack
If you are not using a Hitachi Universal Rack, make sure the electrical specifications of your rack meet the power requirements of the storage system as specified in the VSP One Block Hardware Guide.
Tools, equipment, and personnel
The following items are required for storage system installation:
  • Screwdriver with PZ-2 head. A Phillips screwdriver is also acceptable.
  • 2 units of available rack space with power supply
  • 2 people to lift and rack the storage system
  • Management PC

    For hardware, software, and web browser requirements for the management PC, see Requirements for the management PC.