Hitachi Virtual Storage Platform One Block 20 (VSP One Block 20) storage systems are designed for self-installation, so you can install and set up your storage system for the first time without assistance from a Hitachi Vantara representative.
- Site preparation
- Before you install the storage system, make sure your data center meets all site preparation requirements as specified in the VSP One Block Hardware Guide.
- Rack
- If you are not using a Hitachi Universal Rack, make sure the electrical specifications of your rack meet the power requirements of the storage system as specified in the VSP One Block Hardware Guide.
- Tools, equipment, and personnel
- The following items are required for storage system installation:
- Screwdriver with PZ-2 head. A Phillips screwdriver is also acceptable.
- 2 units of available rack space with power supply
- 2 people to lift and rack the storage system
- Management PC
For hardware, software, and web browser requirements for the management PC, see Requirements for the management PC.