Verify that the delivery area, the destination, and the path between them meet the standard delivery clearance and weight requirements of the storage system.

The delivery area must provide enough space and floor strength to support the packaged equipment cartons for the storage system. Doorways and hallways must provide enough clearance to move the equipment safely from the delivery area to the destination. Permanent obstructions such as pillars or narrow doorways can cause equipment damage. If necessary, plan for the removal of walls or doors.

Verify that all floors, stairs, and elevators you use when moving the storage system to its destination can support the weight and size of the equipment. Failure to do so could damage the equipment or your site.