Step 1: Unpack the storage system

Virtual Storage Platform G130 (with SVP) Installation Guide

Version
88-08-0x
88-07-0x
88-06-0x
Audience
anonymous
Part Number
MK-97G130001-00

Make sure your data center meets all site preparation requirements before you install the storage system. In addition, if you are not using a Hitachi Universal V2 rack, make sure the electrical specifications of your rack meet the power requirements of the storage system.

  1. Inspect all materials for signs of damage. If you see damage, discontinue the installation and contact your Hitachi Vantara representative.
  2. Retain all packing materials in case you need to transport or ship the storage system in the future.
  3. Check the items you received against the packing list. If any items are missing or damaged, discontinue the installation and contact your Hitachi Vantara representative.
  4. Place the keys for the front bezel in a safe place.