Step 1: Unpack the storage system

Virtual Storage Platform E1090 Installation Guide (without SVP)

Version
93-07-2x
Audience
anonymous
Part Number
MK-97HM85053-02

  1. Inspect all materials for signs of damage. If you see damage, discontinue the installation and contact your Hitachi Vantara representative.
  2. Loosen the band around the cartons and open all boxes. Remove all packing materials, envelopes, and boxes from the cartons.
  3. Retain all packing materials and cartons in case you need to transport or ship the storage system in the future.
  4. Check the items you received against the packing list. If any items are missing or damaged, discontinue the installation and contact your Hitachi Vantara representative.
  5. Check the labels of each controller and drive box and verify the location of each component on the rack layout diagram.
  6. Place the keys for the front bezel in a safe place. You will need them to attach the bezel to the front of the controllers.