Workflow for splitting pairs in a consistency group

ShadowImage User Guide

Version
9.8.5
Audience
anonymous
Part Number
MK-98RD9021-15
  1. Define a CTG to which you want to assign the SI pairs using IBM PPRC or CCI.
  2. Verify that all the SI pairs you want to be consistent are assigned to the same SI CTG.
  3. If the pair-split operation fails, troubleshoot CTG pair-split failures (see Consistency group pair-split failures).
  4. Create the pairs.