You can run reports in the background from PUC. The types you can run include Report Designer reports (.prpt), Analyzer reports (.xanalyzer), and Interactive Reports.
You must be connected to a Pentaho Repository and have your reports saved to that repository before running them.
Perform the following steps to run a report in the background:
The file is now processing. The system will deliver the
content generated from the report to your specified location.