Important: The field replaceable units (FRUs) can only be replaced by certified engineers. These components are not customer-replaceable units (CRUs).
FRUs include the following components:
- Whole node (except rail kit, bezel, and PSU)
- SSDs
- Fans
- Bezel
- Power Supply Units (PSUs)
- SFP+ port adapters (Network and cluster port SFP+, and HBA Fibre Channel port SFP+)