Shutting down the servers you are replacing

NAS Platform and Unified Storage Series 4000 Hardware Reference

Version
14.9.x
Audience
anonymous
Part Number
MK-92HNAS030-29
On the servers that you are replacing:
  1. From the server console, issue the command: cn node shutdown --ship --powerdown

    (where node represents the targeted node)

    Wait until the console displays Information: Server has shut down, and the rear panel LEDs turn off. The PSU and server fans continue to run until you remove the power cables from the PSU module. See the appropriate system component section for more information.

    Note: This specific powerdown command prepares the system for both shipping, and potential long-term, post-replacement storage.
  2. Unplug the power cords from the power supplies.
  3. Wait approximately 15 seconds, and then confirm the NVRAM status LED is off.
    If the LED is flashing or fixed, press and hold the reset button for five seconds or until the LED starts flashing. The battery disables when you release the reset button.
  4. Use the following rear panel figure and table to identify and label the cabling placement on the existing server.
    Figure. Rear view of server - HNAS 4060, 4080, and 4100 models

    Item Labels Ports Connections
    1

    1 Cluster interconnect for additional servers
    2 Cluster interconnect for additional servers
    2

    1 Customer data network
    2 Customer data network
    3 Customer data network
    4 Customer data network
    3

    1 Storage or FC switches
    2 Storage or FC switches
    3 Storage or FC switches
    4 Storage or FC switches
    4

    0 Customer facing management network
    5

    1 Private management Ethernet network
  5. If cables are not labeled, label them before removing them from the server.
  6. Remove all cables from the server, and remove the server from the rack.
  7. Remove the rail mounts from the old server, and install them on the new server.
  8. Remove the battery from the old server, and install it in the new server.
  9. Remove the bezel from the old server, and install it on the new server.
  10. Insert the new server into the rack, and connect the power cords to the power supplies.
    Note: Do not make any other cable connections at this time.