The hardware system requirements for Ops Center differ depending on the scale of the system.
If the system scale changes during operation and the result is a mismatch with the scale of the hardware resources, a resource insufficiency might occur. It is recommended that you periodically check the number of resources to detect any mismatches.
Note: For the system requirements, assign 20 GB
or more for the OS swap area. The swap requirements of each product are included in this
swap area.