To prevent damage to the SVP power supply, you must set the voltage selector switch to the correct voltage (115V or 230V) before you install the rack kit on the SVP.
- Verify the onsite supply voltage that will be connected to the storage system and SVP.
- Remove the yellow voltage confirmation label that covers the power cord inlet on the SVP.
- Set the voltage selector switch to appropriate setting based on the onsite supply voltage connected to the storage system and SVP.
- If the onsite supply voltage is 200V-240V, there is no need to remove the tamper-proof label as the default setting for the voltage selector switch is 240V. If the tamper-proof label has been removed, confirm the voltage selector switch before installing the rail kit.
- If the onsite supply voltage is 100V-115V, remove the tamper-proof label and set the voltage selector switch to 115V before installing the rail kit.
CAUTION:
The voltage selector switch has a tamper-proof label covering the switch set to the default 230V setting. If this label has been removed, you must confirm the switch setting before installing the rail kit.