Command sequence example

True Copy for Mainframe User Guide for VSP One Block 85

Version
10.5.x
FileSize
2745 KB
Audience
anonymous
Part Number
MK-26VSP1B036-02
ft:lastEdition
2026-06-23
Product
SVOS

You can issue CGROUP FREEZE/RUN commands manually or through automation (such as with GDPS). The following is an example sequence of actions you can implement.

  1. Suspend host updates to all specified TCz P-VOL.
  2. Block the specified primary-secondary system path to stop update copy operations to S-VOLs.

    If the specified primary system does not have any P-VOLs, the FREEZE command is run without performing any operations (paths are not blocked, SCP is not indicated).

  3. Change all P-VOLs to Suspend status.
  4. Resume host updates to suspended P-VOLs.
  5. Run the add secondary system operation to re-establish the blocked remote paths. After paths are established, make sure to specify the desired SCP time for the primary system. The range for SCP time is 0 to 518,400 seconds (144 hours), and the default is 120 seconds.
  6. After the path is reestablished, run the resynchronize pair operation.