Rolling back after installation failures

Hitachi iQ Studio Installation Guide

Version
1.0.x
Audience
anonymous
Part Number
MK-26HIQS000-01
ft:lastEdition
2026-06-10

The iQ Studio operator handles rollback automatically when a component deployment fails. You do not start rollback manually. During installation and upgrade, the operator monitors each component. If a failure occurs and all retry attempts are exhausted, the operator initiates rollback without further input from you.

Installation or upgrade failures can trigger rollback and recovery when any of the following conditions occur:
  • The iQ Studio Operator enters a RollingBack, RollbackCompleted, or RollbackFailed phase after an installation or upgrade attempt.
  • The ProductRelease resource remains in a Failed state after all automatic retries are exhausted.
  • You need to retry an installation or upgrade after an automatic rollback completes.
  • Automatic rollback fails and you must perform manual cleanup.