The detailed specifications of data migration are as follows:
|
Item |
Specifications |
||
|---|---|---|---|
|
Data migration destination storage node |
A storage node with sufficient free capacity for the user data of the Google Cloud Hyperdisk to be migrated is automatically selected. |
||
|
Maximum number of Google Cloud Hyperdisks that can be migrated simultaneously |
31 |
||
|
Number of Google Cloud Hyperdisks that can be migrated in the external storage |
|
||
|
Minimum capacity of one Google Cloud Hyperdisk of the external storage that can be migrated* |
4 GiB |
||
|
Maximum capacity of one Google Cloud Hyperdisk of the external storage that can be migrated* |
64 TiB |
||
|
Number of initiator nodes required for migration |
1 |
||
|
Connection configuration |
Supported Google Cloud Hyperdisk type |
hd-balanced |
|
|
* For details about Google Cloud Hyperdisk volume types, see the following website. |
|||
Only one initiator node can be added to VSP One SDS Block. If more than one initiator node is added to VSP One SDS Block, data copy in step 2 in Performing data copy might not be successful.
When performing data migration, do not add storage nodes. Adding storage nodes increases internode network usage and load on storage nodes which might degrade data copy performance. Capacity balancing also degrades the data copy performance. Disable capacity balancing, as required. For how to disable capacity balancing, see Editing capacity balance settings for storage nodes in the VSP One SDS Block and SDS Cloud System Administration.