-
Direct server I/O to the storage system at the primary site.
Using the multi-path software, stop I/O from servers to the storage system at the secondary site.
-
On the storage system at the primary site, suspend the GAD pairs by specifying the primary volume.
pairsplit -g oraHA -IH0
- Confirm that the pair status of P-VOLs of GAD pairs has changed to PSUS(Local) and the pair status of the S-VOLs has changed to SSUS(Block).
pairdisplay -g oraHA -fcxe -IH0
- Power off the storage system at the secondary site.