Powering off the primary storage system

Global Active Device for VSP One Block

Version
10.5.x
Audience
anonymous
Part Number
MK-23VSP1B011-10
ft:lastEdition
2026-05-04
  1. Direct server I/O to the storage system at the secondary site.

    Using the multi-path software, stop I/O from servers to the storage system at the primary site.

  2. On the storage system at the secondary site, suspend the GAD pairs to change the pair status of the S-VOLs to SSWS (swap suspension).
    pairsplit -g oraHA -RS -IH1
  3. Verify that the pair status of P-VOLs of the GAD pairs has changed to PSUS(Block) and that the pair status of the S-VOLs has changed to SSWS(Local).
    pairdisplay -g oraHA -fcxe -IH1
  4. Power off the storage system at the primary site.