Powering off the primary, secondary, and external storage systems

Global Active Device for VSP One Block

Version
10.5.x
File Size
25537 KB
Audience
anonymous
Part Number
MK-23VSP1B011-11
ft:lastEdition
2026-06-23
  1. Using the multi-path software, stop server I/O to the primary and secondary storage systems.
  2. On the primary storage system, suspend the GAD pairs by specifying the P-VOLs.
    pairsplit -g oraHA -IH0
  3. Confirm that the pair status of the P-VOLs of the GAD pairs has changed to PSUS(Local) and that the pair status of the S-VOLs has changed to SSUS(Block).
    pairdisplay -g oraHA -fcxe -IH0
  4. On the primary and secondary storage systems, disconnect the quorum disks.
    raidcom disconnect external_grp -ldev_id 0x9999 -IH0
    Note: When you disconnect a quorum disk, SIM (def0zz) (quorum disk blockade) might be issued (zz: quorum disk ID). If this SIM is issued, complete the SIM after powering on the storage system and reconnecting the quorum disk.
  5. On the primary and secondary storage systems, verify that the quorum disks have been disconnected.
    raidcom get path -path_grp 1 -IH0
  6. Power off the primary and secondary storage systems and the external storage system.