Powering off the GAD+UR primary storage system

Global Active Device for VSP One Block

Version
10.5.x
File Size
25537 KB
Audience
anonymous
Part Number
MK-23VSP1B011-11
ft:lastEdition
2026-06-23

Use the following procedure to power off the primary storage system.

  1. Using the multi-path software, stop I/O from servers to the primary storage system.

    Direct server I/O to the GAD secondary storage system.

  2. On the GAD secondary storage system, suspend the GAD pairs by specifying the S-VOL (swap suspension).

    Command example: pairsplit -g oraHA -RS -IH1

  3. Confirm that the pair types and the pair statuses are changed as shown in the following table.

    Before the GAD pair suspension

    After the GAD pair suspension

    Pair type

    Pair status

    Pair type

    Pair status

    P-VOL

    S-VOL

    P-VOL

    S-VOL

    GAD pair

    PAIR (Mirror(RL))

    PAIR (Mirror(RL))

    GAD pair

    PSUS (Block)

    SSWS (Local)

    UR pair

    PAIR

    PAIR

    UR delta resync pair

    PSUE

    SSUS

    UR delta resync pair

    PSUS

    SSUS

    UR pair

    PAIR

    PAIR

  4. Power off the primary storage system.