Planned power off/on: external storage system, I/O at primary site (GAD+UR)

Global Active Device for VSP One Block

Version
10.5.x
Audience
anonymous
Part Number
MK-23VSP1B011-10
ft:lastEdition
2026-05-04

If you do not set a volume for the quorum disk, you do not need to power off or on the external storage system because you do not use it.

Perform the procedure for Powering off the external storage system, I/O at primary site (GAD+UR), and then perform the procedure for Powering on the external storage system, I/O at primary site (GAD+UR), only when you set a volume for a quorum disk using an external storage system.