Set up the storage system at the target UR secondary site. Connect the target UR primary storage system to the target UR secondary storage system with a physical path. In addition, connect the target UR secondary storage system to the server with a physical path. After connecting the server, set each software in accordance with the target UR secondary storage system.
- CCI
- Multi-path software
- Cluster software