Preparing the target UR secondary site

Global Active Device for VSP One Block

Version
10.5.x
File Size
25537 KB
Audience
anonymous
Part Number
MK-23VSP1B011-11
ft:lastEdition
2026-06-23

Set up the storage system at the target UR secondary site. Connect the target UR primary storage system to the target UR secondary storage system with a physical path. In addition, connect the target UR secondary storage system to the server with a physical path. After connecting the server, set each software in accordance with the target UR secondary storage system.

  • CCI
  • Multi-path software
  • Cluster software