Powering on the target GAD primary storage system

Global Active Device for VSP One Block

Version
10.5.x
File Size
25537 KB
Audience
anonymous
Part Number
MK-23VSP1B011-11
ft:lastEdition
2026-06-23

The following describe the procedures for turning on the power of the storage system at the target GAD primary site and then recovering the configuration for migration.

  1. Turn on the power of the storage system at the target GAD primary site, and then resynchronize the temporary GAD pair used for migration.
    Command example:
    pairresync -g HA20 -IH01

    In this configuration, the pair status of the temporary GAD pair used for migration does not change to PAIR and remains COPY.

  2. Resynchronize the target GAD pair.
    Command example:
    pairresync -g HA10 -IH11

    In this configuration, the pair status of the target GAD pair does not change to PAIR and remains COPY.

  3. Resynchronize the target UR pair.
    Command example:
    pairresync -g UR10 -IH11

    In this configuration, the pair status of the target UR pair does not change to PAIR and remains COPY. Continue the migration procedure.