Powering on the source UR secondary storage system

Global Active Device for VSP One Block

Version
10.5.x
File Size
25537 KB
Audience
anonymous
Part Number
MK-23VSP1B011-11
ft:lastEdition
2026-06-23

The following describe the procedures for turning on the power of the storage system at the source UR secondary site.

  1. Turn on the power of the storage system at the source UR secondary site, and then resynchronize the source UR pair.
    Command example:
    pairresync -g UR00 -IH01
  2. Verify that the pair status of the source UR pair becomes PAIR.
    Continue the migration procedure.