The following describe the procedures for turning on the power of the storage system at the source UR secondary site. Turn on the power of the storage system at the source UR secondary site, and then resynchronize the source UR pair. Command example:pairresync -g UR00 -IH01 Verify that the pair status of the source UR pair becomes PAIR. Continue the migration procedure.