Starting GAD+UR operations

Global Active Device for VSP One Block

Version
10.5.x
File Size
25537 KB
Audience
anonymous
Part Number
MK-23VSP1B011-11
ft:lastEdition
2026-06-23

This section describes the procedure for starting operations to have the normal operation status of GAD+UR (UR delta resync pair status changes from PSUE to PSUS) after each pair of GAD+UR is created. After the following procedure, the GAD+UR configuration is ready for normal operation as shown in Configuring GAD 3DC delta resync.

  1. Issuing update I/O to P-VOL/GAD S-VOL: To have the normal GAD+UR operation status, keep updating I/O to P-VOL or GAD S-VOL and wait for two minutes.
    If update I/O is issued to P-VOL or GAD S-VOL, the status information of GAD+UR is reported among the primary, GAD secondary, and UR secondary storage systems. At the time, the UR delta resync pair status is changed from PSUE to PSUS.
  2. Checking UR delta resync pair status and mirror status: Confirm in the GAD secondary storage system the UR delta resync pair status and the mirror status of the journal. Confirm that the UR delta resync pair status is HOLD. In CCI, the pair status of the P-VOL is displayed as PSUS, and the mirror status of the journal is displayed as PJNS.
    pairdisplay -g oraDELTA -fxce -IH1
    Group    PairVol(L/R) (Port#,TID, LU), Seq#,  LDEV#.P/S, 
    Status, Fence, %,  P-LDEV# M  CTG JID AP EM E-Seq# E-LDEV# R/W
    oraDELTA dev3(L)      (CL1-A-1, 0, 1)  822222 4444.P-VOL 
    PSUS    ASYNC, 0 6666    -  0   0   -  -  -      -       -/-
    oraDELTA dev3(R)      (CL1-A-1, 0, 1)  844444 6666.S-VOL 
    SSUS    ASYNC, 0 4444    -  0   0   -  -  -      -       -/-
    pairdisplay -g oraDELTA -v jnl -IH1
    JID MU CTG JNLS AP U(%) Q-Marker Q-CNT D-SZ(BLK) Seq#  Num LDEV#
    000 1  1   PJNS 4  21   43216fde 30    512345    62500 1   39321
  3. Confirm that no failure SIMs are displayed.