This section describes the procedure for starting operations to have the normal operation status of GAD+UR (UR delta resync pair status changes from PSUE to PSUS) after each pair of GAD+UR is created. After the following procedure, the GAD+UR configuration is ready for normal operation as shown in Configuring GAD 3DC delta resync.