Preparing the UR secondary site

Global Active Device for VSP One Block

Version
10.5.x
File Size
25537 KB
Audience
anonymous
Part Number
MK-23VSP1B011-11
ft:lastEdition
2026-06-23

Workflow

  1. Install the storage system and server at the UR secondary site.
  2. Install the following software on the server:
    • CCI
    • Multi-path software
    • Cluster software
  3. Connect the storage system to the server.
  4. Connect the storage system to the GAD storage systems with physical paths.