Connecting the GAD secondary system and the UR secondary system

Global Active Device for VSP One Block

Version
10.5.x
Audience
anonymous
Part Number
MK-23VSP1B011-10
ft:lastEdition
2026-05-04

To connect the GAD secondary storage system and the UR secondary storage system, add the remote connection between the two storage systems.