Recovering from primary site and P-VOL failures (GAD+UR)

Global Active Device for VSP One Block

Version
10.5.x
File Size
25537 KB
Audience
anonymous
Part Number
MK-23VSP1B011-11
ft:lastEdition
2026-06-23

This section describes the procedures for recovering from a primary site failure or a P-VOL failure (LDEV blockade) at the primary site using examples.

GAD pairs might be created between the primary and secondary sites that configure GAD as follows:

  • A P-VOL of a GAD pair is at site 1 and a S-VOL is at site 2.
  • A P-VOL of a different GAD pair is at site 2 and a S-VOL is at site 1.

In this case, recover from a failure at the secondary site. For more information, see Recovering from secondary site and S-VOL failures (GAD+UR).