Unpack the Arista 7020

Installing an HCP RAIN System - Final On-Site Setup

Version
9.7.x
File Size
35463 KB
Audience
anonymous
Part Number
MK-98ARC016-35

Locate the following items in the switch container:

  • Arista 7020 switch
  • Accessory kit containing screws or rack-mounting nuts and bolts

Supply the following items (per switch):

  • Four racking screws
  • Four caged nuts
  1. Set the required items aside in an easy-to-reach location.
  2. Leave the unused items in the switch container, and set the container aside.
    The rest of the items included in the switch container are not necessary for installation. You don't need the original power cords for the switches.

    Do not discard additional items. Pack them together and set them aside.