Considerations for racking nodes

Installing an HCP RAIN System - Final On-Site Setup

Version
9.7.x
File Size
35463 KB
Audience
anonymous
Part Number
MK-98ARC016-35

An HCP G11 system can be racked with up to three S11 Nodes in a single rack. If you are racking HCP S11 Nodes, you need to rack the S11 Nodes first at the bottom of the rack.

If the HCP system has more than three S11 Nodes, the extra S11 Nodes need to be racked in separate expansion racks. For more information about racking an S11 Node expansion rack, see the S11 Node Assembly and Configuration manual.

If the HCP system uses HCP S30 Nodes, the HCP S30 Nodes need to be racked in separate expansion racks. For more information about racking an HCP S30 Node rack, see the HCP S30 Node Assembly and Configuration manual.

If the HCP system uses S11 Node and S31 Nodes, you must adjust the front vertical mounting rails. For more information, see the S11 Node and S31 Node Assembly and Configuration manual.

Important: S11 and S31 Node shock and vibration data is unavailable at this time. Do not ship with these nodes installed in a rack.