To assemble the HCP system:
- Prepare the rack for installation of the HCP system components.
- Attach the HCP G11 Node System serial number sticker.
- Install the PDUs in the rack.
- (Optional) Rack the HCP S11 Nodes.
- Rack the HCP G11 Node.
- Rack the Ethernet switches.
- (Optional) Cover the unused rack units with blanking pates.
- Reassemble the rack.